Deck is visible, dry and documented before underlayment.
Use the tear-off window to identify moisture, rot, delamination, fastening and geometry before covering the deck.
Deck is visible, dry and documented before underlayment.
A covered defect disappears from view, not from the system.
Deteriorated wood, questionable framing or persistent moisture: correct cause/substrate before new roofing.
Roofer and, when needed, structural professional assess exposed substrate before it becomes inaccessible.
Vérifié / checked: 2026-08-23
These links connect this page to the next useful checks and decisions without repeating the full content.
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
This section connects water, soil, climate, safety, materials and seasonal use to existing projects.
This section completes gas, soil, water, fire, climate and structural interfaces.
This section connects systems that become costly or regulated when a primary project triggers them.
This section covers interfaces that become important when multiple home systems interact.
This section connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
This section connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
This section connects small details that become costly once finishes are closed.
This section connects smaller risks that often fall between finishes, appliances, plumbing and local code.
This section connects projects where multiple systems, owners or rules meet.
This section connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
This section helps stop at the right moment before placement, fabrication, ordering, concealment or installation.
These details are small on a drawing but can control water, structure or durability.