VERT / GREEN
Deck is visible, dry and documented before underlayment.
Use the tear-off window to identify moisture, rot, delamination, fastening and geometry before covering the deck.
Deck is visible, dry and documented before underlayment.
A covered defect disappears from view, not from the system.
Deteriorated wood, questionable framing or persistent moisture: correct cause/substrate before new roofing.
Roofer and, when needed, structural professional assess exposed substrate before it becomes inaccessible.
Vérifié / checked: 2026-08-23
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V17 completes gas, soil, water, fire, climate and structural interfaces.
V18 connects systems that become costly or regulated when a primary project triggers them.
V19 covers interfaces that become important when multiple home systems interact.
V26 connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
V28 connects small details that become costly once finishes are closed.
V29 connects smaller risks that often fall between finishes, appliances, plumbing and local code.
V30 connects projects where multiple systems, owners or rules meet.
V32 connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
V41 helps stop at the right moment before placement, fabrication, ordering, concealment or installation.
These details are small on a drawing but can control water, structure or durability.