VERT / GREEN
Observe, document and maintain without altering the system.
RenoAtlas · Ma maison / My Home
Coordinate membrane termination, edge metal and gutter so water actually sheds outside instead of into the fascia or behind the gutter.
V47 · sources checked 2026-08-23
Observe, document and maintain without altering the system.
Measure and diagnose before closing or repairing.
Stop DIY when structure, water, fire or heavy plumbing is involved.
The roofer checks underlayment/membrane, edge metal, slope, fascia, gutter, ice and drainage continuity.
These links connect this page to the next useful checks and decisions without repeating the full content.
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
This section connects water, soil, climate, safety, materials and seasonal use to existing projects.
This section completes gas, soil, water, fire, climate and structural interfaces.
This section connects systems that become costly or regulated when a primary project triggers them.
This section covers interfaces that become important when multiple home systems interact.
This section connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
This section connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
This section connects small details that become costly once finishes are closed.
This section connects projects where multiple systems, owners or rules meet.
This section connects contamination, storm damage, legacy materials and recommissioning before rebuilding.