Solar PV: roof attachment, structure and flashing
Coordinate loads, framing location, attachment method, flashing, roof membrane and future reroofing before penetrating the roof.
VERT / GREEN = documenter/entretenir · JAUNE / YELLOW = vérifier avant travaux · ROUGE / RED = arrêter le DIY et faire valider.
What the professional checks
- Verify structure and load path
- Coordinate anchors, flashing and roofing
Official sources
RNCan — Guide de planification solaire PVChecked: 2026-08-22
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Tools related to this issue
Explore: Systems to check before closing the work
Systems to check before closing the work
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Explore: Advanced diagnostics to cross-check
Advanced diagnostics to cross-check
This section connects water, soil, climate, safety, materials and seasonal use to existing projects.
Explore: Specialized systems to cross-check
Specialized systems to cross-check
This section completes gas, soil, water, fire, climate and structural interfaces.
Explore: Specialized diagnostics to verify
Specialized diagnostics to verify
This section connects systems that become costly or regulated when a primary project triggers them.
Explore: Edge systems to integrate into the project
Edge systems to integrate into the project
This section covers interfaces that become important when multiple home systems interact.
Explore: Often-overlooked service interfaces
Often-overlooked service interfaces
This section connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
Explore: Project risks and overlooked interfaces
Project risks and overlooked interfaces
This section connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
Explore: Finish and service details to verify
Finish and service details to verify
This section connects small details that become costly once finishes are closed.
Explore: Post-disaster and legacy systems
Post-disaster and legacy systems
This section connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
Explore: Use, excavation and construction constraints
Use, excavation and construction constraints
This section connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.
Explore: V47 interfaces not to miss
V47 interfaces not to miss
These details are small on a drawing but can control water, structure or durability.