Inventory sensitive equipment and verify approved point-of-use protection.
Lightning, surge and electrical protection
Distinguish service surge protection, point-of-use devices, grounding/bonding and lightning protection systems.
Checked: 2026-08-22
Homes with solar, EV charging, pumps, networking or costly electronics may need coordinated protection rather than many power bars.
Panel additions, grounding, lightning protection or bonding are specialized electrical work.
Useful tools / data
- Sensitive-equipment inventory
- Service/panel/solar diagram
- Outage/surge history
What the professional checks
- Verify grounding and bonding
- Coordinate service/subpanel/load SPDs
- Assess lightning protection system where warranted
Sources and limits
Rules vary by jurisdiction and scope. Regulated, structural and gas work remains with the required professional.
Tools related to this issue
Explore: Systems to check before closing the work
Systems to check before closing the work
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Explore: Remaining system checks not to miss
Remaining system checks not to miss
This section covers issues that can block a project, cause a loss or become expensive once concealed.
Explore: Edge systems to integrate into the project
Edge systems to integrate into the project
This section covers interfaces that become important when multiple home systems interact.
Explore: Often-overlooked service interfaces
Often-overlooked service interfaces
This section connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
Explore: Household safety and compliance details
Household safety and compliance details
This section connects smaller risks that often fall between finishes, appliances, plumbing and local code.
Explore: Post-disaster and legacy systems
Post-disaster and legacy systems
This section connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
Explore: Invisible constraints before work
Invisible constraints before work
This section checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.