Photograph every cavity and reconcile the scope.
Pre-close wall checkpoint
Hold drywall/insulation until structure, services, firestopping, air sealing, inspections, backing and photos are confirmed.
Checked: 2026-08-21
A missing inspection or unperformed test should be resolved before concealment.
Unresolved structure, plumbing, electrical, fire or moisture issue: do not close.
Useful tools / data
- Close-in checklist
- Camera with references
- Tape/laser for service locations
What the professional checks
- Confirm inspections/tests
- Review each trade before concealment
- Document as-built and backing
Sources and limits
Exact requirements depend on jurisdiction, building and scope. Triage prepares the decision; it does not replace inspection, permits, calculations or regulated trades.
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Advanced diagnostics to cross-check
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
Hidden systems and critical interfaces
These checks target costly problems that often appear only after opening assemblies, conversions or changes of use.
Checkpoints before an irreversible step
V41 helps stop at the right moment before placement, fabrication, ordering, concealment or installation.
- Before concrete placement: irreversible checkpoint
- Layout and elevation benchmark before foundation
- Product substitution: equivalent does not mean identical
- Shop drawings and submittals before fabrication
- Hidden conditions discovered after demolition
- Flatness, level, plumb and square before finishes
- Construction material storage and protection
- Material receiving before installation
- Roof deck after tear-off: inspect before membrane
- Owner-supplied materials: who is responsible for what?