V16 — system diagnostic

Home addition, sunroom and attic conversion

Coordinate siting, foundations, structure, roof, envelope, services, egress and permits when adding living area.

Checked: 2026-08-22

VERT / GREEN

Check zoning, setbacks, easements and feasibility before detailed design.

JAUNE / YELLOW

An addition changes loads, drainage, envelope, heating/ventilation and sometimes electrical/plumbing capacity.

ROUGE / RED

Roof/truss cuts, new foundation, load-bearing opening or attic without confirmed headroom/egress: professional design before work.

Pre-decision triage

Useful tools / data

  • Survey/site plan
  • Existing drawings and measurements
  • Budget including existing interfaces

What the professional checks

  • Design load path and foundations
  • Detail roof/envelope junction
  • Coordinate HVAC, plumbing, electrical, egress and permits

Legacy conditions and resilience systems

Check these before enclosing, excavating, modernizing or automating an existing system.