Check zoning, setbacks, easements and feasibility before detailed design.
Home addition, sunroom and attic conversion
Coordinate siting, foundations, structure, roof, envelope, services, egress and permits when adding living area.
Checked: 2026-08-22
An addition changes loads, drainage, envelope, heating/ventilation and sometimes electrical/plumbing capacity.
Roof/truss cuts, new foundation, load-bearing opening or attic without confirmed headroom/egress: professional design before work.
Useful tools / data
- Survey/site plan
- Existing drawings and measurements
- Budget including existing interfaces
What the professional checks
- Design load path and foundations
- Detail roof/envelope junction
- Coordinate HVAC, plumbing, electrical, egress and permits
Sources and limits
Requirements depend on location, building, product and scope. RenoAtlas helps prepare the decision; it does not replace required analysis, permits, laboratory work or professionals.
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Edge systems to integrate into the project
V19 covers interfaces that become important when multiple home systems interact.
Legacy conditions and resilience systems
Check these before enclosing, excavating, modernizing or automating an existing system.
Often-overlooked service interfaces
V26 connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
Project risks and overlooked interfaces
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
Finish and service details to verify
V28 connects small details that become costly once finishes are closed.
Before finalizing the project
V35 checks that can change drawings, permits, construction methods or structure.
- Professional plans: architect, engineer or other designer?
- Permit closeout, final inspection and occupancy
- Variance, design review and discretionary planning approval
- Temporary construction heating and drying
- Hot work, permits and fire watch
- Infrared thermography and moisture mapping
- Well yield, recovery and storage
- Snow drift at additions and roof steps
- Balloon framing and continuous cavities in old homes
- Wetlands and watercourses before construction