VERT / GREEN
Simple roof without a meaningful height step: use normal local design snow loads with the appropriate designer.
Check unbalanced snow loads when a new lower roof, addition, parapet or roof-height step creates a drift zone.
Simple roof without a meaningful height step: use normal local design snow loads with the appropriate designer.
New lower roof beside a higher wall/roof: explicitly consider drifting, not just uniform snow load.
Do not size addition beams/joists from average snow load when geometry creates drifting.
Sources checked: 2026-08-22. Always confirm local rules and the applicable edition.
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V17 completes gas, soil, water, fire, climate and structural interfaces.
V18 connects systems that become costly or regulated when a primary project triggers them.
V19 covers interfaces that become important when multiple home systems interact.
V26 connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
V28 connects small details that become costly once finishes are closed.
V30 connects projects where multiple systems, owners or rules meet.
V32 connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
These details are small on a drawing but can control water, structure or durability.