VERT / GREEN
Keep coils and area clear per the manual without striking ice from the coil.
Prevent snow/ice obstruction, refreezing defrost water, vibration and poor clearances around the outdoor unit.
Keep coils and area clear per the manual without striking ice from the coil.
Normal defrost produces water; placement, base and drainage should avoid ice buildup or flow toward foundation.
Coil encased in ice, blocked fan, settled unit, damaged wiring or repeated abnormal defrost: technician.
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V17 completes gas, soil, water, fire, climate and structural interfaces.
V18 connects systems that become costly or regulated when a primary project triggers them.
V19 covers interfaces that become important when multiple home systems interact.
V28 connects small details that become costly once finishes are closed.
V29 connects smaller risks that often fall between finishes, appliances, plumbing and local code.
V30 connects projects where multiple systems, owners or rules meet.