Pool: pump, filter, heating and equipment
Coordinate circulation, filtration, heating, drainage, equipment placement, electrical work and winterization with local safety and permit rules.
VERT / GREEN = documenter/entretenir · JAUNE / YELLOW = vérifier avant travaux · ROUGE / RED = arrêter le DIY et faire valider.
What the professional checks
- Verify hydraulics/equipment per manufacturer
- Coordinate electrical, permits and pool safety
Official sources
Québec — sécurité des piscines résidentiellesRBQ — électricitéChecked: 2026-08-22
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Special check related to this project
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Remaining system checks not to miss
V15 covers issues that can block a project, cause a loss or become expensive once concealed.
Advanced diagnostics to cross-check
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
Specialized diagnostics to verify
V18 connects systems that become costly or regulated when a primary project triggers them.