Underground utilities before digging

Prepare excavation, piles, fences, trees, drains or pools by locating buried infrastructure and work zones.

Checked: 2026-08-21

VERT / GREEN

Define the dig area and request locates before digging.

JAUNE / YELLOW

Markings, tolerance zones and excavation methods near utilities must be respected.

ROUGE / RED

Unlocated utility, exposed/damaged line or mechanized excavation in an uncertain zone: stop.

Triage

Useful tools / data

  • Marking paint/stakes per instructions
  • Dimensioned excavation plan
  • Appropriate hand shovel

What the professional checks

  • Interpret locate plans
  • Define approach/excavation method
  • Coordinate utility owners if conflicts

Sources and limits

Exact requirements depend on jurisdiction, building and scope. Triage prepares the decision; it does not replace inspection, permits, calculations or regulated trades.

Advanced systems and special cases

Checks that change sequencing, risk or which professionals must be coordinated.

Hidden systems and critical interfaces

These checks target costly problems that often appear only after opening assemblies, conversions or changes of use.