Post-renovation commissioning

Test systems after work and record baseline values in My Home rather than stopping at visual finishes.

Checked: 2026-08-21

VERT / GREEN

Perform a room-by-room functional walk-through.

JAUNE / YELLOW

Flows, pressure, temperatures, alarms and equipment should be compared with expectations/manuals.

ROUGE / RED

Leak, CO, electrical fault, overheating or failed safety device: do not accept as a cosmetic deficiency.

Triage

Useful tools / data

  • Commissioning sheet
  • Thermometer/hygrometer
  • Photos and serial numbers

What the professional checks

  • Measure key performance
  • Correct and retest discrepancies
  • Hand over manuals, settings and baselines

Hidden systems and critical interfaces

These checks target costly problems that often appear only after opening assemblies, conversions or changes of use.

Deep retrofit and envelope interfaces

Measure, sequence, drain, dry and verify interfaces before concealing work.

Building interfaces to diagnose before enclosure or replacement

These tools connect structure, water, air, frost, wind and mechanical systems so repairs do not hide the cause.