Work completed to approved documents and no final inspection required by the authority: archive permit, photos and invoices.
Actually close a project with the local authority: approved changes, inspections, final documents and occupancy certificate or equivalent when required.
Work completed to approved documents and no final inspection required by the authority: archive permit, photos and invoices.
Outstanding inspections, attestations or revised drawings mean the project is not administratively closed.
Do not occupy or call the project complete when a mandatory final certificate/authorization is missing.
Sources checked: 2026-08-22. Always confirm local rules and the applicable edition.
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V15 covers issues that can block a project, cause a loss or become expensive once concealed.
V34 connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.