Building use or occupancy change before renovation
Changing how a space is used can trigger zoning, permit, fire-safety, accessibility or building requirements beyond ordinary interior work.
VERT / GREEN = documenter · JAUNE / YELLOW = vérifier · ROUGE / RED = arrêter/faire valider.
What the professional checks
- Confirm applicable use/zoning/occupancy
- Determine code, egress, fire and accessibility impacts
Official sources
Ville de Montréal — changement d’usage et occupationChecked: 2026-08-22
V14
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V28
Finish and service details to verify
V28 connects small details that become costly once finishes are closed.