Temporary construction heating and drying

Heat and dry a construction site without creating carbon monoxide, fire, added moisture or overly rapid material curing.

VERT / GREEN

Approved electric heat with proper clearances and humidity monitoring: control temperature and drying for the materials.

JAUNE / YELLOW

Partially enclosed building or wet materials: measure moisture/RH and plan ventilation or dehumidification.

ROUGE / RED

Fuel-fired heater in enclosed, semi-enclosed or tarped space: CO/fire hazard; do not improvise.