VERT / GREEN
Project meets standards and is not subject to qualitative review: proceed with normal permitting.
Identify before final design whether the project is as-of-right or must pass through a variance, design review or another municipal approval.
Project meets standards and is not subject to qualitative review: proceed with normal permitting.
Heritage/sensitive or design-review area: integrate criteria before freezing façade, massing or siting.
A variance is not a right or a way around a prohibited use; obtain the decision before irreversible work.
Sources checked: 2026-08-22. Always confirm local rules and the applicable edition.
V19 covers interfaces that become important when multiple home systems interact.