Balloon framing and continuous cavities in old homes
Recognize multi-storey continuous stud cavities before opening, insulating or routing services because they can transmit fire, smoke and air between levels.
VERT / GREEN
Framing identified and cavities properly compartmented: document before new work.
JAUNE / YELLOW
Opening walls/floors in an older house: check cavity continuity and existing fire blocking before closing.
ROUGE / RED
Do not blindly cut, drill or fill an old cavity without understanding structure, services and fire-blocking needs.
Project triage
What the professional checks
Identify framing type and structural behaviour
Define fire blocking/compartmentation and penetration details