VERT / GREEN
No sensitive area identified after map/site checks and municipal rules confirmed: document the review.
Check before siting whether an addition, deck, access, excavation or drainage affects a wetland, riparian area, shoreline or watercourse mobility zone.
No sensitive area identified after map/site checks and municipal rules confirmed: document the review.
Possible presence or uncertain boundary: have the feature delineated before siting the project.
Do not start fill, excavation, drainage or construction in a regulated area before identifying the authority and required authorization.
Sources checked: 2026-08-22. Always confirm local rules and the applicable edition.
These links connect this page to the next useful checks and decisions without repeating the full content.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
V28 connects small details that become costly once finishes are closed.