Layout plan and benchmark are clearly identified.
Confirm boundaries, setbacks, building axes and reference elevation before excavation/foundation rather than discovering an error after placement.
Layout plan and benchmark are clearly identified.
Visible site features are not automatically legal boundaries.
For regulated layout, use the required surveyor/professional and obtain municipal confirmations.
The surveyor/professional establishes layout where required; the site protects and cross-checks benchmarks before structural work.
Vérifié / checked: 2026-08-23
These links connect this page to the next useful checks and decisions without repeating the full content.
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
This section connects water, soil, climate, safety, materials and seasonal use to existing projects.
This section completes gas, soil, water, fire, climate and structural interfaces.
This section connects systems that become costly or regulated when a primary project triggers them.
This section covers interfaces that become important when multiple home systems interact.
This section connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
This section connects small details that become costly once finishes are closed.
This section checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.
This section connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.