V17 — specialized system

Underpinning, piles and house lifting

Treat settlement, underpinning, piles, staged excavation and house lifting as a combined structure-soil project.

Checked: 2026-08-22

VERT / GREEN

Document movement, cracks, levels, drainage and history before correction.

JAUNE / YELLOW

Soil, loads, services and foundation condition determine whether piles, underpinning or another intervention is appropriate.

ROUGE / RED

Excavating below a footing, lifting the house, transferring loads or installing piles requires professional design and execution.

Pre-work triage

Useful tools / data

  • Dated level/crack survey
  • Foundation/service drawings
  • Soil/structural report where required

What the professional checks

  • Diagnose settlement/soil/water
  • Design shoring/underpinning sequence
  • Design piles/bearings and load transfer