Before concrete placement: irreversible checkpoint

Verify formwork, reinforcement, anchors, sleeves, services, elevations and conditions before concrete makes corrections costly.

VERT / GREEN

Photos, drawings and measurements agree before placement.

JAUNE / YELLOW

Any unconfirmed sleeve, reinforcement or elevation should be clarified before the truck arrives.

ROUGE / RED

Do not place concrete while a required inspection, structural detail, layout or under-slab service remains unconfirmed.

Checkpoint before proceeding

What the professional checks

The structural/site professional verifies formwork, reinforcement, anchors, sleeves, elevations and required inspections before authorizing placement.