GFCI/AFCI and modern protection during renovation
During work in an older home, verify which modern protections are required or appropriate without assuming Ontario rules apply elsewhere.
VERT / GREEN = documenter · JAUNE / YELLOW = vérifier · ROUGE / RED = arrêter/faire valider.
What the professional checks
- Determine protections required by local code
- Test devices and coordination with existing circuits
Official sources
ESA Ontario — liste de vérification électriqueChecked: 2026-08-22
Explore: Systems to check before closing the work
Systems to check before closing the work
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Explore: Finish and service details to verify
Finish and service details to verify
This section connects small details that become costly once finishes are closed.