Deck ledger, cladding and masonry interface
Avoid transferring deck loads into non-structural cladding or creating a water path into the wall.
VERT / GREEN = entretien/documentation · JAUNE / YELLOW = vérifier avant travaux · ROUGE / RED = arrêter le DIY et faire valider.
What the professional checks
- Establish load path
- Coordinate flashing, spacers and cladding
Official sources
CNRC — Code/Guide Partie 9Checked: 2026-08-22
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Tools related to this issue
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Advanced diagnostics to cross-check
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
Specialized diagnostics to verify
V18 connects systems that become costly or regulated when a primary project triggers them.
Finish and service details to verify
V28 connects small details that become costly once finishes are closed.
Household safety and compliance details
V29 connects smaller risks that often fall between finishes, appliances, plumbing and local code.
Shared, access and specialized interfaces
V30 connects projects where multiple systems, owners or rules meet.
V47 interfaces not to miss
These details are small on a drawing but can control water, structure or durability.