Site, access and services

Rights, constraints, soil, rock, water, slope, culvert, well, septic, connections, drainage and site preparation.

Limit

Public mapping is for screening; legal boundaries, soils, water, natural features and services require field confirmation.

Project types

  • Serviced urban lot
  • Rural lot
  • Sloped lot
  • Rocky lot
  • Waterfront lot
  • Wooded lot

Scope to coordinate

  • Cadastre, title, easements, access and surveying
  • Zoning, agricultural zone, heritage and uses
  • Flooding, wetlands, landslides, erosion and contamination
  • Topography, LiDAR, soil, rock, groundwater, frost and stability
  • Water, sewer, well, septic, power, telecommunications and gas
  • Culvert, address, fire access and construction traffic
  • Clearing, soils, excavation, fill, retaining walls and water management

Critical controls

  • Absence from a registry does not prove no constraint.
  • Locate boundaries and utilities before clearing or excavation.
  • Never design a foundation from a nearby borehole alone.
  • Track exported soils and materials where required.

Potential participants

  • Municipality/regional authority
  • Lawyer/notary and surveyor
  • Environmental specialist/biologist as warranted
  • Geotechnical/civil engineer
  • Authorized well and septic specialists
  • Excavation and utility contractor
Common method

Six phases with project-specific application

1
Feasibility and diagnosis Confirm constraints before committing to the project.
Application to this project: Rights, zoning, maps and constraints

Work and decisions

  • Define the need, future use, budget limits and performance target.
  • Survey the existing building or site, services, water, access and known risks.
  • Check zoning, permits, easements, environment and required professionals.
  • Separate confirmed facts, assumptions and unknowns in a dated register.

Hold points and controls

  • No irreversible purchase or contract before confirming major constraints.
  • A map, nearby borehole or verbal opinion does not replace project-specific verification.

Records to keep

  • Baseline surveys and photos
  • Authority responses
  • Risk and assumption register
2
Design, coordination and budget Turn needs into measurable coordinated scope.
Application to this project: Survey, environment, geotechnical and drainage

Work and decisions

  • Coordinate architecture, structure, enclosure, plumbing, electrical, ventilation and drainage.
  • Select products and quality levels with acceptable alternatives.
  • Build a trade budget including fees, permits, tax, contingency and financing.
  • Create a schedule with dependencies, procurement and inspections.

Hold points and controls

  • Review drawings and interfaces before tender.
  • Do not compare prices without common scope and explicit exclusions.

Records to keep

  • Coordinated drawings and details
  • Specifications and inclusion-exclusion matrix
  • Baseline budget and schedule
3
Permits, contracts and mobilization Clearly assign approvals, responsibilities and protections.
Application to this project: Approvals, access and utility contracts

Work and decisions

  • Submit required documents and track permit conditions.
  • Verify licences, insurance, references, subcontractors and capacity.
  • Define payments, changes, holdbacks, warranties and closeout deliverables.
  • Plan safety, occupant, neighbour, water, dust and access protection.

Hold points and controls

  • No start without applicable approvals and issued-for-construction documents.
  • No verbal change without written scope, cost and time.

Records to keep

  • Permits and conditions
  • Contract and appendices
  • Quality, safety and inspection plan
4
Concealed work and hold points Control elements that are difficult to correct after concealment.
Application to this project: Clearing, excavation, connections and buried work

Work and decisions

  • Inspect soil, excavation, reinforcement, anchors, drainage and conduits before concrete or backfill.
  • Verify load paths, connections, bracing and temporary shoring.
  • Coordinate rough systems and penetrations before insulation or drywall.
  • Photograph each concealed element with location and scale.

Hold points and controls

  • No concealment without planned inspection and resolved deviations.
  • Stop immediately for unexpected water, soil, bearing or material.

Records to keep

  • Inspection and test reports
  • Pre-concealment photos
  • As-built record of concealed work
5
Enclosure, systems and commissioning Make the building watertight, functional, balanced and testable.
Application to this project: Testing, backfill, compaction, grading and protection

Work and decisions

  • Verify continuity of water, air, insulation and flashing layers.
  • Test plumbing, drainage, electrical, heating, ventilation, controls and safety.
  • Complete balancing, settings, leakage tests and corrections.
  • Protect sensitive materials until temperature and humidity are suitable.

Hold points and controls

  • Approve mock-ups and critical details before repetition.
  • No equipment acceptance without commissioning and service access.

Records to keep

  • Commissioning reports
  • Product data and settings
  • Equipment and serial number list
6
Closeout, warranties and follow-up Deliver documented maintainable work with seasonal follow-up.
Application to this project: Final survey, tracking and site restoration

Work and decisions

  • Inspect by space and system with photos, owner and due date.
  • Obtain closed permits, as-builts, manuals, warranties and training.
  • Reconcile budget, changes, credits, holdbacks and final balance.
  • Plan maintenance, warranty review and inspection after rain, freeze or heating season.

Hold points and controls

  • No acceptance without dated deficiencies and critical deliverables.
  • Keep an exported copy of the file outside the browser.

Records to keep

  • Deficiency list
  • Closeout file
  • Maintenance and warranty schedule

Related tools

Always confirm applicable permits, professions, insurance and code editions.