VERT / GREEN
Observe, document and maintain without altering the system.
RenoAtlas · Ma maison / My Home
Treat a wall rising above the roof as a complete junction: coping, slope, drip, through-wall flashing, membrane and air barrier.
V47 · sources checked 2026-08-23
Observe, document and maintain without altering the system.
Measure and diagnose before closing or repairing.
Stop DIY when structure, water, fire or heavy plumbing is involved.
The specialist checks membrane/air-barrier continuity, coping slope, flashing, joints, movement, drainage and freeze damage.
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V18 connects systems that become costly or regulated when a primary project triggers them.
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
V28 connects small details that become costly once finishes are closed.