VERT / GREEN
Identify whether any appliance, vent or service still uses the chimney.
Plan chimney removal top-to-bottom: current use, support, penetrations, fire separation, floor openings and durable roof repair.
Important: this tool helps decide what to verify; it does not replace calculations, permits or professional design where required.
Identify whether any appliance, vent or service still uses the chimney.
Removing only the roof portion leaves mass/support and openings that must remain stable and weather-tight.
Unknown chimney support/load role, connected appliance, hazardous materials or structural floor/roof repair: professional plan and permit review.
Sources checked / sources vérifiées: 2026-08-22
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V15 covers issues that can block a project, cause a loss or become expensive once concealed.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V17 completes gas, soil, water, fire, climate and structural interfaces.
V18 connects systems that become costly or regulated when a primary project triggers them.
V19 covers interfaces that become important when multiple home systems interact.
V26 connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
V28 connects small details that become costly once finishes are closed.
V30 connects projects where multiple systems, owners or rules meet.
V32 connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
V33 checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.
These details are small on a drawing but can control water, structure or durability.