Tile, stone and substrate deflection
Verify stiffness, flatness, moisture, membranes and movement joints before installing brittle finishes.
VERT / GREEN = entretien/documentation · JAUNE / YELLOW = vérifier avant travaux · ROUGE / RED = arrêter le DIY et faire valider.
What the professional checks
- Verify structure, substrate and compatibility
- Define membranes and movement joints
Official sources
CNRC — Guide illustré Partie 9Checked: 2026-08-22
Related path
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Measure and organize roomsKeep dimensions, levels, openings and surfaces before purchasing.Open →Compare materialsCompare material families by use, limits, care and cost.Open →Prepare the shopping listGroup materials, tools, parts, quantities, prices and store by project.Open →Compare price observationsCheck dated prices before turning an estimate into a purchase.Open →Choose the required toolsReview the tool dictionary and intended uses before starting.Open →
V14
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V16
Advanced diagnostics to cross-check
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V47
V47 interfaces not to miss
These details are small on a drawing but can control water, structure or durability.