Garage slab to house: slope, threshold, water and salts
The slab-door-wall junction must keep meltwater, wash water and salts away from framing and living space without an improvised threshold.
Triage only — not a design.
VERT / GREEN · JAUNE / YELLOW · ROUGE / RED
What the professional checks
The professional checks slope, drainage, threshold elevation, material condition, salts/chlorides, wall separation and local garage requirements.
Official sources
Checked: 2026-08-24
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Explore: Systems to check before closing the work
Systems to check before closing the work
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Explore: Remaining system checks not to miss
Remaining system checks not to miss
This section covers issues that can block a project, cause a loss or become expensive once concealed.
Explore: Advanced diagnostics to cross-check
Advanced diagnostics to cross-check
This section connects water, soil, climate, safety, materials and seasonal use to existing projects.
Explore: Specialized diagnostics to verify
Specialized diagnostics to verify
This section connects systems that become costly or regulated when a primary project triggers them.
Explore: Edge systems to integrate into the project
Edge systems to integrate into the project
This section covers interfaces that become important when multiple home systems interact.
Explore: Project risks and overlooked interfaces
Project risks and overlooked interfaces
This section connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
Explore: Finish and service details to verify
Finish and service details to verify
This section connects small details that become costly once finishes are closed.
Explore: Shared, access and specialized interfaces
Shared, access and specialized interfaces
This section connects projects where multiple systems, owners or rules meet.
Explore: Invisible constraints before work
Invisible constraints before work
This section checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.
Explore: Use, excavation and construction constraints
Use, excavation and construction constraints
This section connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.