Post-tensioned slabs: drilling, anchoring and coring
Before drilling or opening a structural slab, locate post-tension tendons, reinforcement and services and obtain required structural approval.
VERT / GREEN = documenter · JAUNE / YELLOW = vérifier · ROUGE / RED = arrêter/faire valider.
What the professional checks
- Confirm structural system and tendon paths
- Approve opening location/dimensions