Accessible exterior entry: ramp, landing and threshold
Plan exterior access, threshold, landing, frost, drainage, lighting and guards/handrails without creating an envelope problem.
VERT / GREEN = documenter/entretenir · JAUNE / YELLOW = vérifier avant travaux · ROUGE / RED = arrêter le DIY et faire valider.
What the professional checks
- Verify accessibility standard and local code
- Coordinate structure, frost, drainage and envelope
Official sources
Normes d’accessibilité Canada — CAN/ASC-2.8:2025Checked: 2026-08-22
Tools related to this issue
Manage the project through closeout
Explore: Specialized diagnostics to verify
Specialized diagnostics to verify
This section connects systems that become costly or regulated when a primary project triggers them.
Explore: Finish and service details to verify
Finish and service details to verify
This section connects small details that become costly once finishes are closed.