Secondary suite
Turn part of the property into a self-contained dwelling
Coordinate zoning, structure, egress, fire safety, plumbing, electrical, ventilation, acoustics, accessibility and financing before walls are closed.
Important: Municipal eligibility and construction requirements must be confirmed locally before major spending.
Related path
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Prepare a home purchaseConnect inspection, records, site, insurance and future work to the purchase budget.Open →Screen the property siteOrganize cadastral, zoning, water, slope, utility and natural-hazard checks.Open →Create the address profileKeep the address and relevant official checks locally.Open →Calculate ownership costCombine recurring expenses and planned replacements over five and ten years.Open →Understand the home by eraIdentify typical systems and vulnerabilities by construction era.Open →
V14
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V16
Advanced diagnostics to cross-check
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V17
Specialized systems to cross-check
V17 completes gas, soil, water, fire, climate and structural interfaces.
V18
Specialized diagnostics to verify
V18 connects systems that become costly or regulated when a primary project triggers them.
V28
Finish and service details to verify
V28 connects small details that become costly once finishes are closed.
