VERT / GREEN
Locate every drain/overflow and keep them visible/accessibile.
Check primary drains, overflow scuppers, slopes, parapets, flashing and ponding load if a drain blocks.
Locate every drain/overflow and keep them visible/accessibile.
An overflow is not decorative: it limits water depth and often signals a primary-drain problem.
No secondary drainage, deep ponding, high parapet or unknown structure: roof/structural assessment.
Helps choose the next step; does not replace design, permits or professional diagnosis.
Checked 2026-08-22.
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V15 covers issues that can block a project, cause a loss or become expensive once concealed.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V17 completes gas, soil, water, fire, climate and structural interfaces.
V18 connects systems that become costly or regulated when a primary project triggers them.
V19 covers interfaces that become important when multiple home systems interact.
V26 connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
V28 connects small details that become costly once finishes are closed.
V30 connects projects where multiple systems, owners or rules meet.
V32 connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
These details are small on a drawing but can control water, structure or durability.