Compare roof age/condition and PV system horizon before signing.
Avoid installing new PV on a roof that will soon need replacement and document structure, attachments, membrane and future access.
Compare roof age/condition and PV system horizon before signing.
Future removal/reinstallation cost can change project economics; attachments must transfer loads correctly.
End-of-life roof, unknown structure, leakage or attachment changes: coordinate roofer/structure/electrical before PV.
This triage helps choose the next step; it does not replace design, permitting or professional diagnosis.
Checked 2026-08-22.
These links connect this page to the next useful checks and decisions without repeating the full content.
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
This section covers issues that can block a project, cause a loss or become expensive once concealed.
This section connects water, soil, climate, safety, materials and seasonal use to existing projects.
This section completes gas, soil, water, fire, climate and structural interfaces.
This section connects systems that become costly or regulated when a primary project triggers them.
This section covers interfaces that become important when multiple home systems interact.
This section connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
This section connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
This section connects small details that become costly once finishes are closed.
This section connects projects where multiple systems, owners or rules meet.
This section helps verify systems after work and document the values that make a home safer to operate.
This section connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
This section checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.
This section connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.
These details are small on a drawing but can control water, structure or durability.