VERT / GREEN
Measure/document moisture and cracks before moisture-sensitive finishes.
Coordinate soil, drainage, insulation, under-slab membrane, radon, cracks and concrete moisture before flooring.
Important: this tool helps decide what to verify; it does not replace calculations, permits or professional design where required.
Measure/document moisture and cracks before moisture-sensitive finishes.
An impermeable finish over a wet slab can trap or redirect moisture; the under-slab detail matters.
Free water, heave, active crack, high radon or unknown under-slab membrane in a major project: diagnose before covering.
Sources checked / sources vérifiées: 2026-08-22
These links connect this page to the next useful checks and decisions without repeating the full content.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V17 completes gas, soil, water, fire, climate and structural interfaces.
V18 connects systems that become costly or regulated when a primary project triggers them.
These diagnostics separate simple maintenance from measurement-first and conditions where structure, fire or services require professional review.
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
V34 connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.