VERT / GREEN
Measure and document moisture/odour before covering the slab.
Choose the floor assembly after understanding moisture, slab, drainage, available height and finish-floor tolerance.
This tool is for triage and documentation; structural, fire, gas, refrigerant and electrical work remains subject to applicable rules and professionals.
Measure and document moisture/odour before covering the slab.
Dimple membranes, panels, rigid foam or sleepers change drying, height and partition details.
Free water, slab movement, mould or unknown moisture source: fix the cause before subflooring.
Sources checked / sources vérifiées: 2026-08-22
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V17 completes gas, soil, water, fire, climate and structural interfaces.
V18 connects systems that become costly or regulated when a primary project triggers them.
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
V29 connects smaller risks that often fall between finishes, appliances, plumbing and local code.
V33 checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.
These details are small on a drawing but can control water, structure or durability.