Permit expiry, extension and reactivation
Track validity dates, extension conditions and consequences of an interrupted project before the permit expires.
VERT / GREEN
Known expiry and project on schedule: keep reminders and inspections current.
JAUNE / YELLOW
Major delay or suspended job: immediately check local extension procedure.
ROUGE / RED
Do not assume expired permits can simply resume; rules, drawings, code or fees may need reassessment.
What the professional checks
- Confirm status, expiry, extension and restart conditions
- Assess impacts of changed rules/drawings
Official sources
Sources checked: 2026-08-22. Confirm local rules and the applicable edition.
Related pathContinue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Plan a complete construction projectConnect feasibility, design, permits, concealed work, commissioning and closeout.Open →Check permit triggersPrepare the questions and documents to confirm with the local authority.Open →Check a contractorDocument licence, insurance, scope, payments, changes and warranties.Open →Update a construction costEscalate a historical cost using comparable index values.Open →Prepare pre-delivery reviewRecord documents, enclosure, systems, finishes and deficiencies before closeout.Open → Explore: Systems to check before closing the work
Systems to check before closing the work
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Explore: Remaining system checks not to miss
Remaining system checks not to miss
This section covers issues that can block a project, cause a loss or become expensive once concealed.
Explore: Advanced diagnostics to cross-check
Advanced diagnostics to cross-check
This section connects water, soil, climate, safety, materials and seasonal use to existing projects.