Foundation insulation in termite areas: preserve inspection
In termite areas, foundation insulation or finishes can conceal travel paths. Check local requirements, product limitations and inspectability.
Decision triage
VERT / GREEN · JAUNE / YELLOW · ROUGE / RED
What the professional checks
The professional checks local risk, code/AHJ requirements, exposed wood, inspection path, barriers/protection, insulation product and insect-favouring moisture.
Official sources
Sources checked: 2026-08-24
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Tools related to this issue
Special check related to this project
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Remaining system checks not to miss
V15 covers issues that can block a project, cause a loss or become expensive once concealed.
Advanced diagnostics to cross-check
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
Specialized systems to cross-check
V17 completes gas, soil, water, fire, climate and structural interfaces.
Specialized diagnostics to verify
V18 connects systems that become costly or regulated when a primary project triggers them.
Edge systems to integrate into the project
V19 covers interfaces that become important when multiple home systems interact.
Often-overlooked service interfaces
V26 connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
Project risks and overlooked interfaces
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
Finish and service details to verify
V28 connects small details that become costly once finishes are closed.
Commissioning and everyday safety
V31 helps verify systems after work and document the values that make a home safer to operate.
Post-disaster and legacy systems
V32 connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
Invisible constraints before work
V33 checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.
Use, excavation and construction constraints
V34 connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.