Map foundation drains, sump, storm and sanitary connections
Understand where every pipe goes before changing weeping tile, sump, backwater protection or a sewer branch.
VERT / GREEN
Create an actual map: source → pipe → pump/valve → discharge point.
JAUNE / YELLOW
Older homes or past work can have connections different from assumptions; inspection and municipal records may be needed.
ROUGE / RED
Connecting a foundation drain to the wrong system, bypassing backwater protection or discharging where water returns to the home/neighbour: stop and confirm topology and local rules.
Quick triage
What the professional checks
The plumber/drainage specialist combines camera/tracing, slope, municipal systems, sump, valves and surcharge risk into a reliable map.
Official sources
Checked 2026-08-23
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Tools related to this issue
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Remaining system checks not to miss
V15 covers issues that can block a project, cause a loss or become expensive once concealed.
Advanced diagnostics to cross-check
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
Specialized systems to cross-check
V17 completes gas, soil, water, fire, climate and structural interfaces.
Specialized diagnostics to verify
V18 connects systems that become costly or regulated when a primary project triggers them.
Edge systems to integrate into the project
V19 covers interfaces that become important when multiple home systems interact.
Project risks and overlooked interfaces
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
Finish and service details to verify
V28 connects small details that become costly once finishes are closed.
Post-disaster and legacy systems
V32 connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
Invisible constraints before work
V33 checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.
Use, excavation and construction constraints
V34 connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.
V47 interfaces not to miss
These details are small on a drawing but can control water, structure or durability.