VERT / GREEN
First identify water source/path, grade and drainage condition.
Choose drainage, dampproofing or waterproofing based on water exposure, cracks, groundwater, soil and assembly rather than product marketing.
First identify water source/path, grade and drainage condition.
A dampproofing system intended for damp/intermittent exposure is not automatically waterproofing against hydrostatic water.
Hydrostatic water, active crack, unstable foundation or failed drainage: diagnose cause and design the complete system before covering.
The foundation/envelope specialist checks water source, drainage, cracks, substrate preparation and whether dampproofing or waterproofing is actually required.
Vérifié / checked: 2026-08-23
These links connect this page to the next useful checks and decisions without repeating the full content.
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
This section connects water, soil, climate, safety, materials and seasonal use to existing projects.
This section completes gas, soil, water, fire, climate and structural interfaces.
This section connects systems that become costly or regulated when a primary project triggers them.
This section covers interfaces that become important when multiple home systems interact.
This section connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
This section connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
This section connects small details that become costly once finishes are closed.
This section connects projects where multiple systems, owners or rules meet.
This section connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
This section checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.
This section connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.
These details are small on a drawing but can control water, structure or durability.