VERT / GREEN
First identify water source/path, grade and drainage condition.
Choose drainage, dampproofing or waterproofing based on water exposure, cracks, groundwater, soil and assembly rather than product marketing.
First identify water source/path, grade and drainage condition.
A dampproofing system intended for damp/intermittent exposure is not automatically waterproofing against hydrostatic water.
Hydrostatic water, active crack, unstable foundation or failed drainage: diagnose cause and design the complete system before covering.
The foundation/envelope specialist checks water source, drainage, cracks, substrate preparation and whether dampproofing or waterproofing is actually required.
Vérifié / checked: 2026-08-23
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V17 completes gas, soil, water, fire, climate and structural interfaces.
V18 connects systems that become costly or regulated when a primary project triggers them.
V19 covers interfaces that become important when multiple home systems interact.
V26 connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
V28 connects small details that become costly once finishes are closed.
V30 connects projects where multiple systems, owners or rules meet.
V32 connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
V33 checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.
V34 connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.
These details are small on a drawing but can control water, structure or durability.