VERT / GREEN
Observe where rain/snow water goes before excavating or lowering the threshold.
Coordinate stairs, side walls, guards, threshold, drain, possible pump, snow and grading to avoid creating a water basin against the foundation.
Observe where rain/snow water goes before excavating or lowering the threshold.
A below-grade entrance depends on reliable drainage and a watertight threshold/foundation detail.
Drain without reliable outlet, excavation near footing, retaining wall or non-compliant egress: design/permit required.
Helps choose the next step; does not replace design, permits or professional diagnosis.
Checked 2026-08-22.
These links connect this page to the next useful checks and decisions without repeating the full content.
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
V15 covers issues that can block a project, cause a loss or become expensive once concealed.
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
V17 completes gas, soil, water, fire, climate and structural interfaces.
V18 connects systems that become costly or regulated when a primary project triggers them.
V19 covers interfaces that become important when multiple home systems interact.
V28 connects small details that become costly once finishes are closed.
V29 connects smaller risks that often fall between finishes, appliances, plumbing and local code.
V33 checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.
These details are small on a drawing but can control water, structure or durability.