Build a new house

From site to occupancy: design, foundations, enclosure, systems, inspections, financing and closeout.

Limit

Plans, calculations, regulated work and inspections must be completed or validated by authorized parties.

Project types

  • Slab-on-grade
  • With basement
  • Crawlspace
  • Single-family
  • Duplex or small multifamily
  • High performance

Scope to coordinate

  • Site purchase and feasibility
  • Room program and future accessibility
  • Orientation, form, siting and levels
  • Foundations, structure and loads
  • Enclosure, thermal bridges and airtightness
  • Heating, ventilation, cooling and hot water
  • Plumbing, electrical, communications and EV charging
  • Whole cost including site, utilities, professionals, tax and financing
  • Inspections, commissioning, occupancy and first year

Critical controls

  • Confirm buildability before irreversible purchase.
  • Coordinate all blockouts before concrete and concealment.
  • Test airtightness and systems before finishes.
  • Obtain as-builts and commissioning reports.

Potential participants

  • Municipality/regional authority
  • Land surveyor
  • Architect or technologist as applicable
  • Structural/geotechnical engineer as warranted
  • Authorized contractors and trades
  • Inspector and commissioning specialist
Common method

Six phases with project-specific application

1
Feasibility and diagnosis Confirm constraints before committing to the project.
Application to this project: Site, rights, constraints and utilities

Work and decisions

  • Define the need, future use, budget limits and performance target.
  • Survey the existing building or site, services, water, access and known risks.
  • Check zoning, permits, easements, environment and required professionals.
  • Separate confirmed facts, assumptions and unknowns in a dated register.

Hold points and controls

  • No irreversible purchase or contract before confirming major constraints.
  • A map, nearby borehole or verbal opinion does not replace project-specific verification.

Records to keep

  • Baseline surveys and photos
  • Authority responses
  • Risk and assumption register
2
Design, coordination and budget Turn needs into measurable coordinated scope.
Application to this project: Program, construction system and whole budget

Work and decisions

  • Coordinate architecture, structure, enclosure, plumbing, electrical, ventilation and drainage.
  • Select products and quality levels with acceptable alternatives.
  • Build a trade budget including fees, permits, tax, contingency and financing.
  • Create a schedule with dependencies, procurement and inspections.

Hold points and controls

  • Review drawings and interfaces before tender.
  • Do not compare prices without common scope and explicit exclusions.

Records to keep

  • Coordinated drawings and details
  • Specifications and inclusion-exclusion matrix
  • Baseline budget and schedule
3
Permits, contracts and mobilization Clearly assign approvals, responsibilities and protections.
Application to this project: Permits, financing, contracts and temporary works

Work and decisions

  • Submit required documents and track permit conditions.
  • Verify licences, insurance, references, subcontractors and capacity.
  • Define payments, changes, holdbacks, warranties and closeout deliverables.
  • Plan safety, occupant, neighbour, water, dust and access protection.

Hold points and controls

  • No start without applicable approvals and issued-for-construction documents.
  • No verbal change without written scope, cost and time.

Records to keep

  • Permits and conditions
  • Contract and appendices
  • Quality, safety and inspection plan
4
Concealed work and hold points Control elements that are difficult to correct after concealment.
Application to this project: Foundations, structure and concealed systems

Work and decisions

  • Inspect soil, excavation, reinforcement, anchors, drainage and conduits before concrete or backfill.
  • Verify load paths, connections, bracing and temporary shoring.
  • Coordinate rough systems and penetrations before insulation or drywall.
  • Photograph each concealed element with location and scale.

Hold points and controls

  • No concealment without planned inspection and resolved deviations.
  • Stop immediately for unexpected water, soil, bearing or material.

Records to keep

  • Inspection and test reports
  • Pre-concealment photos
  • As-built record of concealed work
5
Enclosure, systems and commissioning Make the building watertight, functional, balanced and testable.
Application to this project: Enclosure, testing, balancing and finishes

Work and decisions

  • Verify continuity of water, air, insulation and flashing layers.
  • Test plumbing, drainage, electrical, heating, ventilation, controls and safety.
  • Complete balancing, settings, leakage tests and corrections.
  • Protect sensitive materials until temperature and humidity are suitable.

Hold points and controls

  • Approve mock-ups and critical details before repetition.
  • No equipment acceptance without commissioning and service access.

Records to keep

  • Commissioning reports
  • Product data and settings
  • Equipment and serial number list
6
Closeout, warranties and follow-up Deliver documented maintainable work with seasonal follow-up.
Application to this project: Occupancy, deficiencies, warranties and seasonal follow-up

Work and decisions

  • Inspect by space and system with photos, owner and due date.
  • Obtain closed permits, as-builts, manuals, warranties and training.
  • Reconcile budget, changes, credits, holdbacks and final balance.
  • Plan maintenance, warranty review and inspection after rain, freeze or heating season.

Hold points and controls

  • No acceptance without dated deficiencies and critical deliverables.
  • Keep an exported copy of the file outside the browser.

Records to keep

  • Deficiency list
  • Closeout file
  • Maintenance and warranty schedule
Editable tool

Whole-project new-home budget estimator

All values must come from your local quotes and assumptions. Land is intentionally separated.

Interest uses a 50% average-draw approximation; replace it with the lender’s actual draw schedule.