Chimney cricket/saddle: divert water, snow and ice
A wide chimney on a roof slope can create a dead zone where water, snow and debris collect; repairs must coordinate geometry, membrane and flashing.
Triage only — not a design.
VERT / GREEN · JAUNE / YELLOW · ROUGE / RED
What the professional checks
The professional checks chimney width, slope, snow/water accumulation, deck, flashings, membrane and roofing compatibility.
Official sources
Checked: 2026-08-24
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Tools related to this issue
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Remaining system checks not to miss
V15 covers issues that can block a project, cause a loss or become expensive once concealed.
Advanced diagnostics to cross-check
V16 connects water, soil, climate, safety, materials and seasonal use to existing projects.
Often-overlooked service interfaces
V26 connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
Project risks and overlooked interfaces
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
Finish and service details to verify
V28 connects small details that become costly once finishes are closed.
Invisible constraints before work
V33 checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.
V47 interfaces not to miss
These details are small on a drawing but can control water, structure or durability.