Planning
What order should my renovations follow?
Select your projects; RenoAtlas orders them into logical phases and flags dependencies.
Manage the project through closeout
V14
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Deep retrofit and envelope interfaces
Measure, sequence, drain, dry and verify interfaces before concealing work.
V28
Finish and service details to verify
V28 connects small details that become costly once finishes are closed.