VERT / GREEN
Start with building condition, priorities, an energy evaluation and required repairs.
Coordinate envelope, moisture, ventilation, heating, water heating, electrical and renewables from a measured baseline instead of optimizing each trade in isolation.
Start with building condition, priorities, an energy evaluation and required repairs.
Air sealing or major insulation changes can alter moisture, depressurization and heating loads; systems must be reconsidered together.
Active mould, structural deterioration, unstable combustion or assemblies without a drying strategy: resolve these risks before a deep retrofit.
Checked 2026-08-22.
These links connect this page to the next useful checks and decisions without repeating the full content.