← My Home

Protected trees, roots and construction

Check permits, root zones, excavation, grade changes and site access before cutting roots or moving the project footprint.

VERT / GREEN = documenter · JAUNE / YELLOW = vérifier · ROUGE / RED = arrêter/faire valider.

What the professional checks

Official sources

Ville de Montréal — permis d’abattage

Checked: 2026-08-22