Protected trees, roots and construction
Check permits, root zones, excavation, grade changes and site access before cutting roots or moving the project footprint.
VERT / GREEN = documenter · JAUNE / YELLOW = vérifier · ROUGE / RED = arrêter/faire valider.
What the professional checks
- Assess tree health, roots and construction impacts
- Confirm permit, replacement and protection measures
Official sources
Ville de Montréal — permis d’abattageChecked: 2026-08-22
Related path
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Plan a complete construction projectConnect feasibility, design, permits, concealed work, commissioning and closeout.Open →Check permit triggersPrepare the questions and documents to confirm with the local authority.Open →Check a contractorDocument licence, insurance, scope, payments, changes and warranties.Open →Update a construction costEscalate a historical cost using comparable index values.Open →Prepare pre-delivery reviewRecord documents, enclosure, systems, finishes and deficiencies before closeout.Open →
Explore: Remaining system checks not to miss
Remaining system checks not to miss
This section covers issues that can block a project, cause a loss or become expensive once concealed.
Explore: Post-disaster and legacy systems
Post-disaster and legacy systems
This section connects contamination, storm damage, legacy materials and recommissioning before rebuilding.
Explore: Invisible constraints before work
Invisible constraints before work
This section checks electrical, legal, environmental and climate constraints that can block a project before demolition starts.