Overhead powerlines near home work
Before ladders, roof work, trees, scaffolds or additions, identify lines and obtain required local clearances/measures.
VERT / GREEN = documenter · JAUNE / YELLOW = vérifier · ROUGE / RED = arrêter/faire valider.
What the professional checks
- Confirm ownership/voltage/applicable clearance
- Coordinate de-energization/protection if needed
Official sources
ESA Ontario — sécurité des lignes aériennesChecked: 2026-08-22