Ground-mounted solar: site, structure and interconnection
Treat a ground-mounted PV array as a site, structural, electrical and self-generation project, not merely a roof alternative.
Decision triage
VERT / GREEN · JAUNE / YELLOW · ROUGE / RED
What the professional checks
The professional checks solar resource, shading, foundations, wind/snow, buried utilities, grounding, inverter, interconnection and municipal rules.
Official sources
Sources checked: 2026-08-24
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Tools related to this issue
Explore: Systems to check before closing the work
Systems to check before closing the work
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Explore: Specialized systems to cross-check
Specialized systems to cross-check
This section completes gas, soil, water, fire, climate and structural interfaces.
Explore: Specialized diagnostics to verify
Specialized diagnostics to verify
This section connects systems that become costly or regulated when a primary project triggers them.
Explore: Edge systems to integrate into the project
Edge systems to integrate into the project
This section covers interfaces that become important when multiple home systems interact.
Explore: Shared, access and specialized interfaces
Shared, access and specialized interfaces
This section connects projects where multiple systems, owners or rules meet.
Explore: Use, excavation and construction constraints
Use, excavation and construction constraints
This section connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.