Garage drain and oil-water separator
Determine where a garage drain actually discharges and whether the use requires separation, treatment, authorization or no sanitary connection.
VERT / GREEN
Identify drain destination and actual garage use before changing anything.
JAUNE / YELLOW
Repair/maintenance shop is not the same as simple parking; requirements can change with use.
ROUGE / RED
Unknown discharge, hydrocarbon odour or drainage modification: do not discharge oil/solvents; check code and authority.
Quick triage
What the professional checks
The plumber/designer confirms destination, use, required separator, sizing, venting, service and environmental/local rules.
Official sources
Checked 2026-08-23
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Tools related to this issue
Explore: Systems to check before closing the work
Systems to check before closing the work
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Explore: Remaining system checks not to miss
Remaining system checks not to miss
This section covers issues that can block a project, cause a loss or become expensive once concealed.
Explore: Advanced diagnostics to cross-check
Advanced diagnostics to cross-check
This section connects water, soil, climate, safety, materials and seasonal use to existing projects.
Explore: Specialized systems to cross-check
Specialized systems to cross-check
This section completes gas, soil, water, fire, climate and structural interfaces.
Explore: Specialized diagnostics to verify
Specialized diagnostics to verify
This section connects systems that become costly or regulated when a primary project triggers them.
Explore: Edge systems to integrate into the project
Edge systems to integrate into the project
This section covers interfaces that become important when multiple home systems interact.
Explore: Project risks and overlooked interfaces
Project risks and overlooked interfaces
This section connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
Explore: Finish and service details to verify
Finish and service details to verify
This section connects small details that become costly once finishes are closed.
Explore: Use, excavation and construction constraints
Use, excavation and construction constraints
This section connects use permits, soil, excavation, neighbouring structures and public-space logistics before hard-to-reverse work.
Explore: V47 interfaces not to miss
V47 interfaces not to miss
These details are small on a drawing but can control water, structure or durability.