Check for an accessible vertical stack and simultaneous shower use.
Drain-water heat recovery
Recover shower heat through a drain-stack heat exchanger without mixing waste and potable water.
Checked: 2026-08-22
Performance depends on model, orientation and plumbing; choose a tested unit and suitable configuration.
Changes to potable/drain systems require plumbing/code compliance and cross-connection prevention.
Useful tools / data
- Stack diameter/height
- NRCan product list
- Shower-use profile
What the professional checks
- Select compliant configuration
- Coordinate water/drain piping
- Verify future access
Sources and limits
Triage helps prepare the project; it does not replace permits, calculations, inspections or regulated work.
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Tools related to this issue
Explore: Systems to check before closing the work
Systems to check before closing the work
This section connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Explore: Remaining system checks not to miss
Remaining system checks not to miss
This section covers issues that can block a project, cause a loss or become expensive once concealed.
Explore: Advanced diagnostics to cross-check
Advanced diagnostics to cross-check
This section connects water, soil, climate, safety, materials and seasonal use to existing projects.
Explore: Specialized systems to cross-check
Specialized systems to cross-check
This section completes gas, soil, water, fire, climate and structural interfaces.
Explore: Specialized diagnostics to verify
Specialized diagnostics to verify
This section connects systems that become costly or regulated when a primary project triggers them.
Explore: Project risks and overlooked interfaces
Project risks and overlooked interfaces
This section connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
Explore: Finish and service details to verify
Finish and service details to verify
This section connects small details that become costly once finishes are closed.
Explore: V47 interfaces not to miss
V47 interfaces not to miss
These details are small on a drawing but can control water, structure or durability.