← Back to My Home

Accessible-ready kitchen and bathroom

Use a major renovation to place structure, plumbing, electrical systems and clearances so future adaptation does not require demolition.

VERT / GREEN

Plan backing, circulation and adaptable zones before closing walls.

JAUNE / YELLOW

An accessible-ready space is not necessarily currently accessible or compliant with every local rule.

ROUGE / RED

Avoid placing plumbing, structure or mechanical systems in areas intended to become future clearances.

Project triage

What the professional checks

The designer coordinates circulation, backing, plumbing, electrical systems and cabinetry with actual needs and applicable standards/rules.

Official sources

Vérifié / checked: 2026-08-23