Window replacement: insert or full-frame?
An insert keeps the existing frame; full-frame replacement exposes the rough opening, insulation, air seal, flashing and hidden deterioration.
Decision triage
VERT / GREEN · JAUNE / YELLOW · ROUGE / RED
What the professional checks
The professional checks frame, rough opening, structure, flashing, drainage, insulation and air-barrier connection.
Official sources
Sources checked: 2026-08-24
Continue with the right tools
These links connect this page to the next useful checks and decisions without repeating the full content.
Systems to check before closing the work
V14 connects envelope, air, fire, structure, water and code instead of treating each project in isolation.
Specialized diagnostics to verify
V18 connects systems that become costly or regulated when a primary project triggers them.
Edge systems to integrate into the project
V19 covers interfaces that become important when multiple home systems interact.
Often-overlooked service interfaces
V26 connects systems that cross utility, plumbing, HVAC, envelope and metering boundaries.
Project risks and overlooked interfaces
V27 connects payment, water, envelope, ventilation and jobsite details that often create costly surprises.
Household safety and compliance details
V29 connects smaller risks that often fall between finishes, appliances, plumbing and local code.
Shared, access and specialized interfaces
V30 connects projects where multiple systems, owners or rules meet.
Commissioning and everyday safety
V31 helps verify systems after work and document the values that make a home safer to operate.
Post-disaster and legacy systems
V32 connects contamination, storm damage, legacy materials and recommissioning before rebuilding.